Projects · 6 recent · the East Valley

Six recent projects, with sizes and systems.

What it was, how big, what we installed, and who it was for. References are in the capabilities packet.

Copper pipes forming a cross shape on blue background

Representative photo

Medical TI · 2025

Santan Village Surgery Center

Size22,000 sq ft, 4 ORsScopeFull plumbing, medical gas (O2, MA, MV, WAGD), source equipment, 6020 verificationForOkland Construction

Ambulatory surgery center in a new shell. Four operating rooms with full medical gas, a source room with duplex medical air and vacuum, and verification passed with zero corrections. Binder handed to the state surveyor as-is.

A close-up of a machine

Representative photo

Hydronic · 2025

Price Corridor Central Plant

Size800-ton plantScopeTwo chillers, cooling towers, primary/secondary CHW and CW piping, welded steel 12"Fora mechanical contractor

Central plant for a two-building tech campus. Welded carbon steel mains, grooved branches, flushed and treated before balancing. Balancer's report matched design flows within 5% on first pass.

Red and white metal pipe

Representative photo

School TI · 2024

Gilbert Public Schools Culinary Lab

Size9,800 sq ftScopeCommercial kitchen plumbing, 1,500-gal grease interceptor, gas, floor sinks, equipment connectionsForthe district

A high school culinary program built over one summer window. Fourteen pieces of gas equipment verified against cut sheets; interceptor sized to the town standard; passed health and building final the same day.

A man working on a pipe in a cabinet

Representative photo

Hospital · 2024

Chandler Regional Medical Gas Expansion

Size3 floors, 48 outletsScopeMedical gas extension in an occupied tower, zone valves, area alarms, night shutdownsForthe hospital

Extended O2, MA and MV to a renovated patient floor in an occupied hospital. Six planned shutdowns, each coordinated with nursing and documented under ILSM. Verified with zero corrections.

A black and white photo of a bunch of pipes

Representative photo

Multifamily · 2024

Main Street Lofts

Size186 units, podiumScopeFull plumbing: cast iron stacks, PEX-A distribution, central water heating, backflowForMark-Taylor Construction

Five stories over a podium. First stack built with the GC and inspector present, then repeated 31 times. Every rough test photographed; zero re-inspections across 186 units.

Brown and black metal pipe

Representative photo

Restaurant TI · 2023

Dobson Ranch Restaurant Row

Size3 restaurants, 14,000 sq ftScopeKitchen plumbing, shared grease interceptor, gas, backflow, service contractForthe property owner

Three restaurant shells built out in sequence for one owner. One Bluewater foreman for all three; the owner put the center on a jetting and backflow contract at turnover.

Next step

Have a project like one of these?

A project manager or Carol replies the same business day. Contract clients on the 24-hour line get a plumber, not a service.

Demonstration site. Bluewater Plumbing & Mechanical is a fictional company. Designed and built by Ironsite Digital to show what a commercial plumbing contractor's website should be. Want one like it?